Update
I'm so far behind on this blog! So much we've done. Well Star water and Nugent drilling came in, one nasty, rainy day, and installed a submersible pump, updated the lines, and capped off the well. So nice to have this done. No pics. Flooring, sheetrock, HVAC is all moving along and getting scheduled in. Ron, Rick, and Dad are prepping everything so Tony Frey can do the drywall. We're doing basically everything. In the bedrooms, they might be able to just mud over the tape and tidy up the walls, or may just cover like we're doing elsewhere. Wood Floors: Rabi/Midvalley will be doing the wood floors and is scheduled to start early December. Jose will start on the HVAC after that. Bathroom : The Bathroom has disappeared. Nothing but joists and studs. Sad to see the cast iron tub go. I would keep it if it were not green. Just can't do the green! We may try to keep the vanity if we can spruce it up enough and recover the formica. Otherwise it gets replaced too. Guess it...